Scheduling Loss Percentage for SR Transmission System            
FROM DATE TO DATE SEM LOSS % APPLICABLE PoC LOSS %  
      SLAB I SLAB II SLAB III SLAB IV SLAB V SLAB VI SLAB VII SLAB VIII SLAB IX DATE OF PUBLISHING
13.11.17 19.11.17 2.22 2.11 1.86 1.61 1.36 1.11 0.86 0.61 0.36 0.11 10/11/2017
20.11.17 26.11.17 2.08 2.04 1.79 1.54 1.29 1.04 0.79 0.54 0.29 0.04 17/11/2017