Scheduling Loss Percentage for SR Transmission System            
FROM DATE TO DATE SEM LOSS % APPLICABLE PoC LOSS %  
      SLAB I SLAB II SLAB III SLAB IV SLAB V SLAB VI SLAB VII SLAB VIII SLAB IX DATE OF PUBLISHING
24.04.17 30.04.17 2.86 2.43 2.18 1.93 1.68 1.43 1.18 0.93 0.68 0.43 21/04/2017
01.05.17 07.05.17 2.84 2.42 2.17 1.92 1.67 1.42 1.17 0.92 0.67 0.42 28/04/2017