Scheduling Loss Percentage for SR Transmission System            
FROM DATE TO DATE SEM LOSS % APPLICABLE PoC LOSS %  
      SLAB I SLAB II SLAB III SLAB IV SLAB V SLAB VI SLAB VII SLAB VIII SLAB IX DATE OF PUBLISHING
20.03.17 26.03.17 2.70 2.35 2.10 1.85 1.60 1.35 1.10 0.85 0.60 0.35 17/03/2017
27.03.17 02.04.17 2.88 2.44 2.19 1.94 1.69 1.44 1.19 0.94 0.69 0.44 24/03/2017