Scheduling Loss Percentage for SR Transmission System            
FROM DATE TO DATE SEM LOSS % APPLICABLE PoC LOSS %  
      SLAB I SLAB II SLAB III SLAB IV SLAB V SLAB VI SLAB VII SLAB VIII SLAB IX DATE OF PUBLISHING
12.06.17 18.06.17 2.68 2.35 2.10 1.85 1.60 1.35 1.10 0.85 0.60 0.35 09/06/2017
19.06.17 25.06.17 2.70 2.35 2.10 1.85 1.60 1.35 1.10 0.85 0.60 0.35 16/06/2017